Cardin, M-A (2011) Quantitative performance-based evaluation of a procedure for flexible design concept generation, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Chiang, R (2002) Agency and incentive contract in private investment of transport project: An exploration of fundamental relationships, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Garvin, M J (2001) Strategic indicators for characterization of water system infrastructure and management, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Kristinsdottir, A (2012) Risks and decision making in development of new power plant projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Kua, H W (2006) The design of effective policies for the promotion of sustainable construction materials, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Lee, S (2006) Dynamic planning and control methodology: Understanding and managing iterative error and change cycles in large-scale concurrent design and construction projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Miller, J B (1995) Aligning infrastructure development strategy to meet current public needs, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Minelli, P (2020) Improved methods for managing megaprojects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Moret, Y (2011) Modeling cost and time uncertainty in rail line construction, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Park, M (2001) Dynamic planning and control methodology for large-scale concurrent construction projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

  • Type: Thesis
  • Keywords: complexity; market; concurrent construction; policy; scheduling; simulation; construction project
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304757982
  • Abstract:
    Concurrent construction has been widely used for modern construction projects, as a method to shorten time-to-market. Concurrent construction, however, requires a careful and systematic approach to its planning and management, since it also has greater potential to impact the construction process than the traditional more serial method. These industrial trends and challenges in concurrent construction, together with increased understanding of dynamics and complexities of construction, have increased the demand for a more efficient planning and control method. In this context, the simulation-based scheduling method that has the potential to more effectively deal with the dynamic state of construction processes has currently emerged as an alternative to the network-based method. However, despite its potential advantages over the network-based method, very few of the existing simulation tools have overcome their practical limitations and have proven their applicability to real construction processes. As an effort to address some of these challenging issues, this thesis presents Dynamic Planning and Control Methodology (DPM) that has been developed to help prepare a more robust construction plan against uncertainties and to provide policy guidelines for the planning and control of a construction project, taking into consideration the context in which the project is being developed. The use of DPM would be especially beneficial for construction projects performed concurrently and involving higher complexity and uncertainties, ensuring that those projects can be delivered in time without driving up costs.

Slaughter, E S (1991) Rapid innovation and integration of components: Comparison of user and manufacturer innovations through a study of residential construction, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Sousa, R L (2010) Risk analysis for tunneling projects, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Taylor, D D J (2018) Tools for managing intermittent water supplies, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Tsai, I T (2007) Default and renegotiation: Financial structure and incentive in public-private partnership contracts, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Viteri, V R (2003) Experiential learning environments for structural behavior, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Wang, M-T (1989) Knowledge processing for a construction management database, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Wooldridge, S C (2002) Balancing capital and condition: An emerging approach to facility investment strategy, Unpublished PhD Thesis, , Massachusetts Institute of Technology.

Yan, S (1992) Intermodal pricing and operations using network flow techniques, Unpublished PhD Thesis, , Massachusetts Institute of Technology.